top of page

Utility Excavations 

EZE Shoring

The EZE Shoring composite trench lining system​ is the world’s first non-metallic trench lining system. this high-performance composite system comprises of only five different components.

The lightweight, easy to assemble system uses composite struts (where necessary) to make it 100% non-conductive.

This makes it the safest, easiest and lightest trench lining product available for operatives undertaking the installation or repair of underground utilities – gas, water, electricity, Telecom and general construction.

The Training consists of theory (classroom activities) and a practical demonstration.

original.png
original.jpg

Centre Number 21607

CITB Site Safety Plus, HSA, SSSTS, SMSTS course, First Aid, EUSR, Confined Spaces, NRSWA, Yorkshire

Thirsk Rural Business Centre, Blakey Lane, Thirsk Yorkshire United Kingdom YO7 3AB

© 2020 Plant and Safety Training Yorkshire LTD. All Rights Reserved.

  • Facebook
bottom of page